Precast Concrete Bridge Girder Yard

Civil Infrastructure | Dhaka-Chittagong Highway Expansion • Completion: 2024

Precast Concrete Bridge Girder Yard
2024

Engineering Overview & Implementation

Synchronized tandem lifting system for 180-ton precast concrete bridge beams. Features synchronized wireless dual-crane control and millimeter-accurate hoist positioning.

Equipment Scope & Project Results

Equipment Delivered: 2x 100t MG Heavy Box-Type Gantry Cranes for Tandem Lifting
Lifting Parameters: 100t (200t Tandem) | Span 32m, Lift 16m
Location: Dhaka-Chittagong Highway Expansion (Global Export)
Industry Sector: Civil Infrastructure
PROJECT DATA SHEET

Technical Summary

Client / EPC: National Expressway Infrastructure Group
Industry: Civil Infrastructure
Location: Dhaka-Chittagong Highway Expansion
Rated Capacity: 100t (200t Tandem)
Span & Lift Height: Span 32m, Lift 16m
Year: 2024
Request Similar Crane Layout