Hydroelectric Power Station Turbine Hall

Renewable Energy & Power | Sichuan Hydro Basin • Completion: 2023

Hydroelectric Power Station Turbine Hall
2023

Engineering Overview & Implementation

Super-heavy duty turbine rotor maintenance crane with micrometric slow speed hoisting (0.1 m/min) for turbine generator alignment.

Equipment Scope & Project Results

Equipment Delivered: 1x 150/30t Custom Low-Headroom Overhead Bridge Crane
Lifting Parameters: 150t / 30t | Span 24m, Lift 28m
Location: Sichuan Hydro Basin (Global Export)
Industry Sector: Renewable Energy & Power
PROJECT DATA SHEET

Technical Summary

Client / EPC: Cascade Power Authority
Industry: Renewable Energy & Power
Location: Sichuan Hydro Basin
Rated Capacity: 150t / 30t
Span & Lift Height: Span 24m, Lift 28m
Year: 2023
Request Similar Crane Layout